Nostalgia Night

Music & Lyrics By: Matthew McCollum

Book By: Sofya Levitsky-Weitz

Directed By: John Simpkins

Set Design: Mia Irwin

Costume Design: Ella MacZura

Lighting Design: David Reginold

Sound Design: Michael D. Aboah

Projection Design: Sydney Smith 

Photos By: Cassidy Burke, Quinn McDonald, and William Wellman

I was the Technical Director for this show. I took part in weekly production meetings by updating the rest of the production team on scenic's progress and answered or asked questions on behalf of the scenic team. I helped research material costs and ensured that our team met budget requirements. Additionaly, I created draftings and then assembled them into drawing packages. Then, I presented the draftitngs to the carpenters for construction and made a weekly build schedule. If the carpenters had any questions or problems, they would present them to me and I would troubleshoot the problem and do my best to find a solution. I also created the load-in plan and lead load-in. I attended tech and took note of elements in need of repair. If the scenic designer had any additional notes, I would add them to mine and then create a punch list to be sent to the carpenters the following day. After the show opened, I would analyze the performance report nightly to see if there were any notes for the scenic team to address. Finally, I created the strike plan and led strike the morning after closing.

Check out documentation below.

Show Photos

Budget Pass

Nostalgia Budget.JPG
PB Budget.jpg
SP Budget.jpg
PL P Budget.jpg

drawing packages.

Photo Booth From Paper to in the Space

Select Platforms Draftings and CNC Cut Files

Masonite Layout for all Platform Structures and Select CNC Cut Files

Ground Plan used for Load-In

GP.jpg

Load-in Estimate Using Pessimistic, Optimistic and Most Likely Time

 Day of Load-in Plan

Load-In Process Photos

Example of a Punch List Sent to Carpenters

As the carpenters completed the tasks it would get Highlighted in red on Microsoft Teams so I could see what did or didn't get done that day. If a task was not completed I would copy it over to the next day of notes for them until it was finished. 

 Day of Strike Plan